top of page
University of Hawaii
Manoa, Keller Hall Classroom Renovation
Honolulu, HI - 2022
Provided site investigation of existing ocnditions and demolition requirements. Phase 1 involved a visual assessment of hte 5 dormitory buildings and prepared assessment/property conditions report. A project scope of work would be determined and from there, RFP design build bid documents would be prepared. The report would be based on visual assessments and record drawings. No destructive methods will be used to evaluate hidden/concealed conditions. One of hte main focus of this project was to completely replace the entire plumbing system.
bottom of page